11/03
Saturday
With the help of our friend Bill Charles, we moved the rest of our belongings over from Bill's house. We were able to get the large recliner couch into the parlor only after Bill figured out how to dismantle the sections. We also found a way to get all the den and parlor furniture to fit perfectly. Although we still have some smaller things to move and much to set up, our 8 month adventure has officially come to an end!
11/02
Friday
Kenny, the electrician, put up the new porch light and completed some other minor electrical wiring.
With the help of Bill Zuchowski, we moved the apartment furniture into our new house. We were able to get the large bedroom pieces in through the upstairs windows, once our son Jeff arrived to help. Now that our bed was moved, we took up permanent residence by spending the night in our new home.
11/01
Thursday
We began moving boxes from the apartment to the house.
10/31
Wednesday
Phil's crew finished all their inside painting today.
John Robinson came and touched up the claw foot tub in the downstairs bathroom.
Michelle and her friend Mohammed finished cleaning the inside of the house.
Penny's delivered our new den furniture - we're not sure where it's all going to fit.
10/30
Tuesday
Phil's crew gave the new porch a second coat and continued doing some final inside painting.
Michelle and her friend Mohammed continued cleaning the inside of the house.
10/29
Monday
Phil's crew painted the new porch, sanded and varnished the treads of the steps, and did some miscellaneous inside painting.
10/28
Sunday
Buff brought over another van load of boxes from the apartment to the house.
Buff finished moving the old bricks and spread out the mulch under the big tree.>
10/27
Saturday
Phil's crew painted the kitchen, downstairs bathroom, and the trim in the upstairs bathroom.
Judy painted some more blue in the eating area..
Buff and Zach brought two van loads of stuff from Clinton and two van loads of boxes from the apartment to the new house. They also moved over half the pile of old bricks from under the big tree to behind the shed.
10/26
Friday
Rich Hummer installed a new garage door with an automatic opener.
10/25
Thursday
Ihling's Appliance delivered and installed our new dishwasher, refrigerator, washer and dryer.
Tim, our 'mirror man', hung our bathroom mirrors.
Michelle Huntington came to clean the walls in the house.
10/24
Wednesday
No activity
10/23
Tuesday
Ralph Kitz finished the landscaping. Our yard now looks like a park. What a difference!
Jim McCormick completed finishing all hardwood floors.
10/22
Monday
Ralph Kitz, our landscaper, replaced our existing sidewalk with brick pavers matching those on our patio and put in a connecting sidewalk. He also planted trees and shrubs.
10/21
Sunday
Judy finished painting the windows in the eating area as well as the large radiator in the kitchen.
Buff moved one van load of boxes from the apartment basement to the house basement and stripped the stairway steps.
10/20
Saturday
Jim McCormick's group gave all the hardwood floors a second coat of varnish.
Judy painted the windows in the eating area and scraped the window in the stairway.
Buff moved two van loads of basement bookcases and boxes from Clinton to the new house.
10/19
Friday
Jim McCormick's group finished sanding upstairs and varnished all the hardwood floors.
10/18
Thursday
Jim McCormick's group restained the downstairs. (Judy didn't like the first stain). They also continued sanding the upstairs.
10/17
Wednesday
Jim McCormick's group finished sanding the first floor and continued sanding the upstairs. They also stained the downstairs.
Johnny the sider tied in the vynil for the new windows in the sided part of the house.
10/16
Tuesday
Jim McCormick's crew continued sanding the first floor and began sanding the upstairs.
Johnny the sider / roofer put the shingles on our new porch.
10/15
Monday
Jim McCormick stopped by late in the day and began sanding the new hardwood on the first floor.
10/14
Sunday
Buff and Judy completed sanding and painting the radiators.
10/13
Saturday
Brad completed his part of the side porch. It still needs to be shingled, caulked and painted.
Buff and Judy worked on sanding and painting the radiators.
10/12
Friday
Bill Rudnick complete all plumbing, including connecting all radiators, sinks, tubs and the shower. There is a problem with the pilot light for the furnace, which keeps going out.
10/11
Thursday
Buff and Judy sanded two of the painted radiators. (Judy didn't like the spray paint and is going to paint them by hand)
10/10
Wednesday
No activity.
10/9
Tuesday
Judy hand painted the den radiator.
10/8
Monday
Buff and Bill Charles moved all of the radiators on the front porch back into the house.
10/7
Sunday
Phil and two of his helpers finished painting all the walls in rooms with hardwood floors.
Judy spray painted some of the radiators.
Buff painted the rest of the outside windows.
10/6
Saturday
Bradley got about half done putting up the side porch. He will finish his work next Saturday.
Phil and two of his helpers continued painting the walls.
Kenny the Electrician hung a couple of lights, installed an additional outlet in the TV room, and got electricity to the new porch.
10/5
Friday
Phil the painter painted the first coat on the walls in the two bedrooms.
10/4
Thursday
Phil the painter finished varnishing.
10/3
Wednesday
Phil the painter painted a second coat on the walls in the parlor and den and did some more varnishing.
Judy gave four of the six downstairs radiators a first coat of paint.
10/2
Tuesday
Phil the painter painted a second coat on the walls in the dining room, living room and hall. and the first coat on the walls in the parlor and den.
Phil the Spackler finished spackling the walls.
10/1
Monday
Phil the painter painted the first coat on the walls in the dining room, living room and hall.
Phil the Spackler continued spackling the walls.
9/30
Sunday
Phil the Spackler continued spackling any walls or ceilings which needed it.
Bobby the Painter continued varnishing trim and doors.
Judy painted some of the wood in the eating area blue.
Buff painted a second coat on the outside basement and garage windows.
9/29
Saturday
Phil the Spackler worked on the walls.
Tom the Carpenter installed the last replacement windows in the laundry room.
Buff painted the outside of the basement and garage windows and screen molding.
9/28
Friday
Ernie grouted the tile on the kitchen wall and installed the marble saddle on each of the upstairs bathroom door openings.
Walter finished cleaning the downstairs windows.
Another Phil, a spackler, worked on the walls which will be painted next week.
9/27
Thursday
Ernie put up the white tile above the kitchen sink.
Walter cleaned most of the downstairs windows.
9/26
Wednesday
Phil and Bill continued staining and varnishing all the wood upstairs.
9/25
Tuesday
Phil, Bill and Bobby continued staining and varnishing all the wood.
9/24
Monday
Phil and Bill continued staining and varnishing all the wood.
9/23
Sunday
Bobby, one of Phil's workers, varnished some of the upstairs windows and doors.
Judy continued staining new wood and Buff scraped all the basement and garage windows.
9/22
Saturday
Buff and Judy scraped the outside of the large windows at both ends of the house and scraped off some of the ivy roots from the brick.
9/21
Friday
Phil and Bill continued staining and varnishing all the wood.
Tom came back to lower the recently installed windows and Artie put back up the trim.
9/20
Thursday
Phil and Bill continued staining and varnishing all the wood.
9/19
Wednesday
Phil and Bill continued staining and varnishing all the wood.
Tom came back and installed the other two windows in the eating area.
9/18
Tuesday
Phil and Bill continued staining and varnishing all the wood.
9/17
Monday
Phil and Bill continued staining and varnishing all the wood.
9/16
Sunday
Judy continued staining new wood and Buff finished painting the basement screen windows.
9/15
Saturday
Tom, another carpenter, installed most of the remaining replacement windows.
Kenny, the electrician, continued installing lights and outlets.
Bradley, our framer who began our renovation six months ago, stopped by to lay out our new side porch.
Our garage door man stopped by to take measurements for our new overhead garage door. He says he should be able to install the door in about a week and a half.
9/14
Friday
Phil the painter returned and continued staining and sealing the wood downstairs.
9/13
Thursday
No activity
9/12
Wednesday
Bill Lothian installed the new countertops in the kitchen.
9/11
Tuesday
No activity
9/10
Monday
Ken, the electrician, continued wiring and the A/C and the furnace.
9/9
Sunday
Judy stained new woodwork for about 2 hours.
9/8
Saturday
Kenny, our electrician, was at the house wiring the A/C and furnace.
9/7
Friday
No activity - Note: We are waiting for Phil, our painter, to finish up some other work. He has said that once he comes back to our house, he will stay there until he is done. After that, we just need to have the floors sanded, stained and varnished.
Remaining replacement windows delivered.
9/6
Thursday
No activity
9/5
Wednesday
No activity
30 Yard Dumpster removed.
9/4
Tuesday
No activity
9/3
Monday
Judy did some staining of new trim.
Buff removed ivy from brick and painted the front outside windows.
9/2
Sunday
No activity
9/1
Saturday
Buff and Judy spent most of the day cleaning the house and garage.
8/31
Friday
New shower door installed.
8/30
Thursday
Buff stripped the railing for the stairs.
8/29
Wednesday
No activity
8/28
Tuesday
Art Wagner's crew completed trim work.
Old kitchen countertops and sinks removed.
8/27
Monday
New french doors for den and new pantry doors for laundry room delivered.
Art Wagner's crew continued installing the trim and den paneling and they installed the new doors.
8/26
Sunday
Judy continued staining and I got the basement screen windows ready for repainting and rescreening.
8/25
Saturday
Judy and I cleaned up the house. Judy did a little staining and I took out the basement screen windows to repair.
8/24
Friday
No activity
8/23
Thursday
Art Wagner and two of his guys finished hanging doors and putting up most of the trim. They also put up oak paneling in the den.
Kenny the electrician continued installing lights
8/22
Wednesday
Art Wagner and his crew continued hanging doors and putting up trim.
8/21
Tuesday
Art Wagner and his four man crew began hanging doors and putting up trim.
8/20
Monday
Phil stained the new front door and stripped the side door.
Bill finished putting the wanes coating in the eating area.
8/19
Sunday
No activity
8/18
Saturday
Bill began installing the wanes coating in the eating area and put up some trim around the doors.
Judy and I finished priming the front porch (it took most of the day).
8/17
Friday
Kenny, the electrician, installed lights in the eating area, the laundry room, the den, the parlor, and outside the back door.
Phil continued painting and staining. He began to paint the front porch, which I will finish.
8/16
Thursday
Bill replaced the front door as well as side garage door.
Phil continued staining and painting.
8/15
Wednesday
No activity
8/14
Tuesday
Shorty, the plumber, installed most of the plumbing fixtures (toilet, sinks, tub, etc.).
Michael Large finished repairing the front porch. He also patched around the new garage windows.
8/13
Monday
Phil continued to stain some trim.
8/12
Sunday
Judy finished scraping and staining the window frames.
8/11
Saturday
Judy continued scraping the window frames.
8/10
Friday
Ernie grouted the tile in the eating and laundry rooms.
8/9
Thursday
Ernie tiled the eating and laundry rooms.
Michael Large continued working on concrete repairs to the front porch.
8/8
Wednesday
Michael Large poured concrete for the side porch.
Ernie leveled the eating and laundry room floors.
Judy worked on scraping two windows.
8/7
Tuesday
Michael Large continued working on both side and front porches.
8/6
Monday
Phil's Dad (Michael Large) filled in most of the enlarged side porch and worked on patching the front porch.
Judy continued scraping window frames.
Buff cleaned the upstairs and brought all the doors out of the garage into the house.
8/5
Sunday
Phil continued staining and varnishing the first floor.
8/4
Saturday
Phil continued staining and varnishing the first floor.
Judy scraped over half of the first floor window frames.
Buff finished stripping most of the trim.
8/3
Friday
Phil continued staining and varnishing the first floor.
Bathroom vanity delivered and installed.
Load of top soil delivered.
8/2
Thursday
Phil's dad put down cinder block on side porch and back filled.
Judy scraped a window frame.
I began identifying and moving the sanded doors from the garage to their correction location.
8/1
Wednesday
Phil painted kitchen ceiling and varnished kitchen trim.
Phil's dad poured side porch footings.
Judy scraped a window frame.
7/31
Tuesday
New doors were delivered for the front of the house and the side of the garage.
Note: we found out right before we went away that the order for the den - parlor french doors and all the replacement windows was lost, which will set us back a few weeks.
7/30
Monday
Phil finished sanding the doors and painted all the crown molding.
The plumber delivered the claw foot bathtub and removed a radiator we no longer needed.
7/23/7/29
While we were
cruising to
Bermuda
Phil sanded the doors, varnished the kitchen wanes coating, painted the bathroom wanes coating, power-washed the front porch and the radiators, and painted a few other areas.
Phil's neighbor Bill put the kitchen cabinets and oven back and put wanes coating up in the kitchen.
Phil's father dug the front porch footings.
McCormick's Flooring finished installing the hardwood on the first floor and added hardwood upstairs in the expanded dormer.
7/21
Saturday
Judy and Buff finished stripping most of the wood trim.
7/20
Friday
McCormick's Flooring finished installing most of the hardwood in the parlor and den.
7/19
Thursday
McCormick's Flooring finished installing hardwood in the hall, living, and dining rooms.
Bill Charles and I finished moving the first floor radiators onto the porch for future cleaning and painting.
7/18
Wednesday
McCormick's Flooring began installing hardwood in the hall, living, and dining rooms. They did not get very far.
7/17
Tuesday
Ernie finished tiling and grouting the kitchen.
Shed delivered.
7/16
Monday
Ernie put down most of the kitchen tile.
7/15
Sunday
Judy stripped much of the trim which had been taken down and could not be planed.
I stripped the steps and associated trim.
7/14
Saturday
Judy stripped the trim on the two upstairs double windows and the trim on two doors.
I stripped the baseboard molding at the top of the stairs as well as the railing and top step.
7/13
Friday
Bill and Glen put up wanes coating in the bathroom and installed the door knob on new back door.
7/12
Thursday
Bill and Glen moved center kitchen cabinets and ripped out rest of old floor. They also glued and screwed in tongue and groove plywood as a sub floor. Finally they planed off the trim which had been taken down to sheet rock upstairs.
Judy and I painted the wanes coating which is going in the bathroom.
Ralph Kitts came over to discuss landscaping.
7/11
Wednesday
Ernie grouted the shower and bathroom floor.
Jim McCormick removed kitchen flooring left close to wall cabinets to get it ready to tile.
7/10
Tuesday
Bill put up crown molding in the living and dining room and hung new back door.
Ernie tiled the shower and bathroom floor.
7/9
Monday
Bill (a neighbor of Phil the Painter) put up wanes coating and crown molding on the ceiling in the eating area and put up crown molding in the kitchen and hall. It looks great!
Ernie finished putting mud in new bathroom.
I stripped the baseboard molding in the hallway.
7/8
Sunday
Judy finished stripping the varnish and stain off the trim in the living and dining rooms.
I finished pulling out the nails in the kitchen sub floor and finished stripping the varnish and stain from the baseboards in the living and dining rooms.
7/7
Saturday
Buff, with great help from Bill Charles, ripped up the entire kitchen floor (except up close to the cabinets). We began at 8:30 a.m. and finished at 6:00 p.m.
Judy worked on stripping varnish and stain off trim in living and dining rooms.
7/5
Friday
Ernie the tile man began putting 'mud' in new bathroom floor, a prerequisite for putting down tile.
7/5
Thursday
Phil continued working on doors and staining.
I began ripping up the kitchen floor (major job - floor is 1 1/4" thick with about 7 nailed & glued layers).
7/4
Wednesday
No activity
7/3
Tuesday
Phil stained the doors in the kitchen (5) and varnished the wanes coating which Judy had painted.
7/2
Monday
Phil the Painter sanded and stained the trim on the door and window openings in the kitchen. He also sanded the doors for that area.
7/1
Sunday
I finished stripping the baseboard in the den and parlor.
Judy finished stripping the door and window trim in den and parlor.
Judy painted and stained the additional wanes coating and other trim.
6/30
Saturday
I ripped up the flooring in the hall and took out the remaining nails.
Judy worked on stripping the door and window trim in den and parlor.
I began stripping the baseboard in the den.
6/29
Friday
No activity
6/28
Thursday
Phil the Painter gave all new ceilings and closets a second coat of paint.
Bill Cuba installed air conditioning unit outside.
Judy began stripping the window trim in the den.
I worked on identifying where stripped doors go.
6/27
Wednesday
Phil the Painter painted all the new ceilings (those that were sheet rocked and all the new or expanded closets.
6/26
Tuesday
Judy and I cleaned up the house. We also found out that the shed can't be delivered until the dumpster is moved.
6/25
Monday
Palmer Nursery removed all the tree stumps, concrete sidewalks and cistern pad. They also leveled and prepared a stone pad for the storage shed.
6/24
Sunday
Rich Luster's crew completed removing the varnish and stain from the trim in the kitchen and baby's room.
6/23
Saturday
Rich Luster's crew continued removing the varnish and stain from the trim in the kitchen and baby's room.
6/22
Friday
Michael finished spackling, put up shelving in the laundry room, and replaced two windows in the garage.
Rich Luster's crew began removing the varnish and stain from all the trim in the kitchen and baby's room.
6/21
Thursday
Michael continued spackling, put up sheet rock in kitchen, and hung a cabinet in the laundry room.
6/20
Wednesday
Michael spackled the downstairs rooms.
The gas company marked out the lines for Friday's digging.
I pulled out the nails in the dining room floor while Judy stained some more Wanes Coating.
Judy and I pulled out the wood forms in the newly poured basement (major job).
6/19
Tuesday
The mason poured 2" plus of concrete into the basement.
6/18
Monday
The mason and plumber stopped by today to move the old furnace out of the basement so he could pour 2" of concrete tomorrow.
Judy and I spent the evening working at the house. I removed the floor nails from the living room (3 hours worth) and Judy stained the Wanes Coating.
6/17
Sunday
No activity
6/16
Saturday
Judy and I worked at the house for much of the day. I removed all the floor nails in the parlor and den (it took 5 hours) and I cut the Wanes Coating which Judy stained. We also tore down the paneling in the kitchen.
6/15
Friday
No activity
6/14
Thursday
McCormick's Flooring there this afternoon to rip out floors in four rooms downstairs.
Judy and I spent an hour and half afterwards carrying the flooring out to the dumpster.
6/13
Wednesday
No activity
6/12
Tuesday
No activity
6/11
Monday
Wanes coating and crown molding delivered today.
I continued cleaning up the spackle dust.
Judy worked on stripping wood trim.
6/10
Sunday
Judy and I began cleaning up all the spackle dust.
Judy began stripping wood trim.
6/9
Saturday
Spacklers gave walls their final sanding.
6/8
Friday
No activity
6/7
Thursday
Spacklers continued spackling walls which were sheet rocked.
6/6
Wednesday
No activity
6/5
Tuesday
Spacklers gave all sheet rocked walls their first coat of spackle.
6/4
Monday
No activity
6/3
Sunday
My dad and I pulled out some nails out of the trim which had been removed.
6/2
Saturday
My dad and I took all of the sheet rock scraps (there was a lot) out of the house and put them into the dumpster.
Judy and my mom put up air bubble wrap on the door openings on the first floor to protect.
6/1
Friday
The sheet rockers finished putting up sheet rock.
5/31
Thursday
Sheet rockers finished master bedroom and began guest bedroom.
The landscapers cut down and removed all the shrubs and a couple of trees.
5/30
Wednesday
Sheet rockers completed most of the master bedroom today
5/29
Tuesday
Sheet rockers finished most of the first floor today.
Judy and Valerie picked up the first set of doors which we had sent out for stripping.
5/28
Monday
Judy and I insulated above the eating area and laundry (major project).
Judy and I snaked cable and phone wires up to the second floor.
5/27
Sunday
No activity
5/26
Saturday
Sheet rockers began working. Put up sheet rock on downstairs ceilings.
I cleaned at the house most of the day and helped the sheet rockers.
Judy and I tried various methods of stripping the stain and varnish off of trim.
5/25
Friday
Michael finished up his first week at the house. He removed the trim upstairs in preparation of the sheet rocking.
5/24
Thursday
Michael framed out two closets in the laundry room and moved the closet door from the den to the baby's room.
5/23
Wednesday
Michael began his first week at the house. He widened the doorway leading from the den to the TV room.
5/22
Tuesday
Kenny the electrician did the rough wiring today.
5/21
Monday
No activity
5/20
Sunday
Judy finished stripping the vinyl flooring out of the eating area.
I took off rest of the wall and ceiling tiles and pulled out nails in laundry room and eating area
5/19
Saturday
I set up our new porch swing.
I pulled out the nails from all the wood that the framers had taken off.
Judy began taking up the floor in the eating area
5/18
Friday
No activity
5/17
Thursday
Plumbers finished up rough plumbing today.
Rich Luster came to look at wood stripping job.
5/16
Wednesday
Plumbers continued rough plumbing and installation of new gas burner.
5/15
Tuesday
Plumbers continued rough plumbing and installation of new gas burner.
5/14
Monday
Plumbers continued rough plumbing. They put in rough plumbing to laundry room.
5/13
Sunday
No activity
5/12
Saturday
Judy and Kathy took the doors to Allentown to have them stripped.
I took down the paneling and ceiling in the laundry room.
5/11
Friday
No activity
5/10
Thursday
Plumbers put new boiler in basement and rook out the old water heater.
5/9
Wednesday
Bill Cuba's crew put in the air conditioning ducts throughout the house.
The plumbers put in a new toilet in downstairs bath and got much of the plumbing roughed in.
5/8
Tuesday
No activity
5/7
Monday
No activity
5/6
Sunday
I completed the asbestos removal.
I took down all the doors to be stripped.
I removed a piece of tile in the bathroom for the A/C duct.
Judy took down much of the paneling in the eating area.
5/5
Saturday
Zach and I moved the entire scrap pile from under the tree into the dumpster (major job).
I continued removing asbestos from the basement.
5/4
Friday
Johnny the sider began siding the eating area outside wall.
I began moving the scrap pile into the dumpster.
5/3
Thursday
Johnny the sider finished siding the back dormer and the ceiling on the front porch.
Plumbers did some rough plumbing.
5/2
Wednesday
Johnny the sider finished siding the front dormers and began siding the back dormer.
5/1
Tuesday
Johnny the sider continued siding the front dormers.
Phil the painter and his wife stopped by to look at the scope of work.
4/30
Monday
Johnny the sider shingled the front dormers and began siding.
4/29
Sunday
I continued working on asbestos removal from the basement.
4/28
Saturday
I picked up nails, etc. in the yard from last week's work.
I spent most of the day working on asbestos removal from the basement.
4/27
Friday
Brad and his crew finished framing front dormer.
Johnny the sider shingled the new bathroom dormer.
4/26
Thursday
Brad's crew finished framing in the bathroom and got most of front dormer done.
I continued removing asbestos from the basement.
4/25
Wednesday
Brad's crew opened up the roof and began framing in the bathroom.
4/24
Tuesday
No activity
4/23
Monday
No activity
4/22
Sunday
No activity
4/21
Saturday
I worked on asbestos removal in the basement all day.
4/20
Friday
No activity
4/19
Thursday
No activity
4/18
Wednesday
No activity
4/17
Tuesday
Wanes coating and trim delivered.
4/16
Monday
No activity
4/15
Sunday
I worked on asbestos removal in the basement.
4/14
Saturday
I worked on asbestos removal in the basement.
4/13
Friday
I worked on asbestos removal in the basement.
3/31 - 4/12
No activity
3/30
Friday
Closed on new house.
3/15
Thursday
Closed on old house.